Recent Projects   Date: 08 Dec 05

These contracts covered the following elements of work: -  


a)         Project management, procurement, design and installation, testing & commissioning of MEICA plant
b)         Design and construction of LV electrical installations to BS7671
c)         Design, configuration, testing, installation and commissioning of process control, supervisory control and data acquisition systems and instrumentation
d)         Working on water supply operational sites
e)         Working on contracts that are subject to CDM regulations
f)          Working with health & safety plans

 

Client              South East Water
Site                 Barcombe WTW.
Value              £54K  
Work carried out
Sludge Thickener Plant. Carlton Controls Ltd won the contract to build the Motor Control Centre for the Sludge Thickener Plant & Washwater Recovery Plant. The Control Panel (below) was designed to accommodate various pump controls that function in a duty/standby and/or duty/assist environment. There are a total of 18 starters in the MCC, all controlled and monitored by a PLC system with data connection to telemetry. The polymer dosing plant was then upgraded, followed by the more recent addition of the High Lift Pump Air Circuit Breaker incomers and the refurbishment of the existing High Lift Pump controls.  

 

Client              South East Water
Site                 College Ave pumping station - Maidenhead
Value              £88K  
Work carried out
Refurbishment of existing MCC to house 6 off 65 kW 'soft start' borehole pump starters, 2 off 37 kW variable speed booster pump starters & 2 off 150 kW 'soft start' booster pump starters. Modicon PLC & MMI supplied, installed and programmed to fully automate the pumping regime to suit water demand.

 

Client              Three Valleys Water
Site                 Reddricks Lane pumping station - Harlow
Value              £156K  
Work carried out
Supply & installation of a number of motor control centres incorporating variable speed inverters to control pumping and water treatment.
   

 

Client              Three Valleys Water
Site                 Digswell pumping station
Value              £45K  
Work carried out
Supply & installation of a motor control centre incorporating variable speed inverters to control pumping and water treatment.

For further information on our products and services please complete our enquiry form or contact us direct at:

Carlton Controls Ltd
Unit C3, Lea Road Trading Estate, Waltham Abbey, Essex, EN9 1AE
Tel: 01992 767609   ||  Fax: 01992 788446  ||  Email: mail@carlton-controls.co.uk

 
Home ::  Products  :: Latest Projects  :: Contact Us
© - Carlton Controls Ltd - 2005